• Total constructed area about 45,000 m2.
• Phase (1), 330 rooms on total area bout 23,100 m2.
• 5 Buildings on total constructed area5 areaabout 12,500 m2
for staff housing 5 Floors each building.
• Phase (2) Main Building on 6,000 m2 on 3 floors with its
ramps and doubleon doubleheight entrance.
• Desalination Plant (Production Building Desalination Building
2×500 m3 underground water tank – clarifying basin ).
• Power Plant ( generator house 1000 m2 ).
• Sewage Treatment plant.
• Irrigation Tank.
Forward
Now is the time for a new challenge. Now is the time to engrave the true corporate identity on the established Concrete, and move with this steady business to reach new heights and achieve greater milestones.